TECHNICAL NOTES:
- The valve needs to be installed so that the flow passes in the proper direction through the valve.
- The valve has to be installed upright.
- • The valve should be installed in a clean water system (after flushing). In case the valve is installed during flushing or pressure testing, the valve must be fully opened, otherwise the diaphragm insert could get damaged.
- Install the actuator after the pipeline pressure test.
DIMENSIONS: